April 9, 2026
Build Log 13: The Last Mile.
Mar 9-10 — three weeks from empty repo to shipped product.
The last mile is always the longest. Not because the work is harder, but because it's the work nobody notices until it's missing.
86 Help Docs
Wrote documentation for every feature. Every button, every flow, every edge case. If a user can click it, there's a help doc explaining what it does. This took longer than most features took to build.
Agent Silence Prevention
The worst agent experience is silence. User asks a question, nothing happens. Built comprehensive error handling for every failure mode: rate limits, timeouts, context overflow, auth failures, network issues. A 5-minute safety timeout as the last resort — if everything else fails, the agent still responds with an error instead of disappearing. The agent always answers now. Sometimes the answer is "something went wrong," but that's infinitely better than nothing.
Figma Integration
Figma OAuth with 4 read-only tools and auto-image export. Designers share a Figma link, the agent can read the design and pull images into the conversation. One more tool the agent can use without anyone leaving the workspace.
Plan History
Version list, detail view, restore. Plans evolve through conversation — now you can see every version, compare changes, and roll back if something went sideways.
Closing the Loop
Detect PR completion via webhook, write status back to Jira and Notion, seed the next iteration. Settings role-gating. Weekly status reports via cron. The kind of plumbing that makes the difference between a tool and a workflow.
Three weeks. Empty repo to shipped product. The last mile is the one that makes everything before it matter.